A reliable contractor for internationally specified tenders
We operate in full compliance with the contract, procurement and safeguard discipline required by European Union, World Bank, İLBANK and EBRD financed infrastructure projects.
Knowledge base: who finances the infrastructure?
EU Pre-Accession Assistance (IPA)
Under the EU Instrument for Pre-Accession Assistance (IPA) and the Environment & Climate Action Sectoral Operational Programme, wastewater, potable water and integrated solid-waste infrastructure is grant-supported. Such works require EU procurement procedures (PRAG), FIDIC contracts and compliance with EU environmental directives — the discipline Burka Yapı operates under.
World Bank Investment Project Financing
World Bank financed works follow the Bank's Procurement Regulations for IPF Borrowers and its Environmental & Social Framework (ESF). International/national competitive bidding, transparent evaluation and regular reporting are essential.
İLBANK Sustainable Cities Project
İller Bankası (İLBANK) finances municipal water, wastewater and urban infrastructure investments through World Bank-guaranteed loans (the Sustainable Cities Project and its additional financing). Our Pozantı Wastewater Treatment Plant is one such internationally specified project.
European Bank for Reconstruction and Development
The EBRD provides loans to municipal and environmental infrastructure projects, requiring compliance with its Procurement Policies & Rules and performance requirements. These projects likewise demand FIDIC and international reporting discipline.
FIDIC Conditions of Contract
Internationally financed works apply FIDIC (Red/Yellow Book) conditions of contract: independent engineer supervision, measurement-based payment, claim and variation management. We work in full fidelity to the contract and programme within this system.
Environmental & Social Safeguards
In line with the World Bank ESF and EU environmental legislation, environmental-social management plans (ESMP), stakeholder engagement, occupational health-safety and grievance mechanisms are applied at every stage. Sustainability sits at the core of the project.
The discipline international work demands
Quality Management System
Consistency and continuous improvement in processes.
Environmental Management System
Control and reduction of environmental impact.
Occupational Health & Safety
A safety culture targeting zero accidents on site.
International Contract Compliance
Contract management for internationally financed works.
// Certificate samples shared on request
Common questions
01Do you have experience in internationally financed tenders?+
Yes. We carry out World Bank and İLBANK (Sustainable Cities Project) financed works and comply with the FIDIC contract, ESF safeguard and reporting discipline required by EU IPA and EBRD procedures.
02Which fields do you work in?+
Wastewater treatment, solid waste & landfill, water supply & sewerage, agricultural infrastructure, hydraulic structures & flood control, roads & engineering structures, and nation's gardens / landscaping.
03In which regions do you operate?+
Headquartered in Ankara, we operate across Türkiye: Adana, Samsun, Van, Şanlıurfa, Balıkesir, Bilecik, Bolu, Ağrı and other provinces.
04Do you deliver turnkey projects?+
Yes; from survey and design to construction, mechanical-electrical installation, commissioning and trial operation, we deliver turnkey.
05What is your quality and safety approach?+
Certified materials and workmanship, ISO-based quality-environment-OHS management and full contract compliance; on-time, on-budget delivery is fundamental.